Apr 2016
NauticAWT Completes FASL Well Completion Design, Nigeria
From June 2014 to April 2016 NauticAWT carried out the well completion engineering design, equipment specification, inspection and procurement, well completion programme preparation and well start-up procedure preparation for 2…
/ 30 Apr 2016 /Jacket Subsea Repair Works Completed in India
NauticAWT has completed the subsea repair works of structural members and joints of 2 platforms for SWIBER in India. The scope of work included assistance with pre-engineering survey and detailed engineering required…
/ 08 Apr 2016 /Certification of Materials for Renewable Energy Applications with Vestas Wind Systems A/S
NauticAWT’s ultra high performance cementitious (UHPC) NaX™ products have been certified and approved for use in onshore wind turbine foundations by Vestas Wind Systems A/S (Vestas). Vestas is a wind…
/ 08 Apr 2016 /Acquisition of Facilities in Johor, Malaysia
Nautic Materials Sdn Bhd, a wholly-owned subsidiary of NauticAWT Limited, has entered into a sales and purchase agreement of a factory, laboratory and testing facility at Nusa Cemerlang Industrial Park…
/ 07 Apr 2016 /NauticAWT concludes ‘Additional Development of Vasai East Project’ grouting contract
NauticAWT has completed its grouting contract for the installation of 2 new four legged fixed jacket platforms (VSEB and VSEC), which are located at Vasai East Field in India. L&T…
/ 07 Apr 2016 /